Payne Hackenbracht & Sullivan
FAR - Part 22 Application of Labor Laws to Government Acquisitions
- Subpart 22.1 -- Basic Labor Policies
- 22.101 -- Labor Relations.
- 22.101-1 -- General.
- 22.101-2 -- Contract Pricing and Administration.
- 22.101-3 -- Reporting Labor Disputes.
- 22.101-4 -- Removal of Items from Contractors Facilities Affected by Work Stoppages.
- 22.102 -- Federal and State Labor Requirements.
- 22.103 -- Overtime.
- Subpart 22.2 -- Convict Labor
- Subpart 22.3 -- Contract Work Hours and Safety Standards Act
- 22.300 -- Scope of Subpart.
- 22.301 -- Statutory Requirement.
- 22.302 -- Liquidated Damages and Overtime Pay.
- 22.303 -- Administration and Enforcement.
- 22.304 -- Variations, Tolerances, and Exemptions.
- 22.305 -- Contract Clause.
- Subpart 22.4 -- Labor Standards for Contracts Involving Construction
- 22.400 -- Scope of Subpart.
- 22.401 -- Definitions.
- 22.402 -- Applicability.
- 22.403 -- Statutory and Regulatory Requirements.
- 22.403-1 -- Davis-Bacon Act.
- 22.403-2 -- Copeland Act.
- 22.403-3 -- Contract Work Hours and Safety Standards Act.
- 22.403-4 -- Department of Labor Regulations.
- 22.404 -- Davis-Bacon Act Wage Determinations.
- 22.404-1 -- Types of Wage Determinations.
- 22.404-2 -- General Requirements.
- 22.404-3 -- Procedures for Requesting Wage Determinations.
- 22.404-4 -- Solicitations Issued Without Wage Determinations for the Primary Site of the Work.
- 22.404-5 -- Expiration of Project Wage Determinations.
- 22.404-6 -- Modifications of Wage Determinations.
- 22.404-7 -- Correction of Wage Determinations Containing Clerical Errors.
- 22.404-8 -- Notification of Improper Wage Determination Before Award.
- 22.404-9 -- Award of Contract Without Required Wage Determination.
- 22.404-10 -- Posting Wage Determinations and Notice.
- 22.404-11 -- Wage Determination Appeals.
- 22.404-12 – Labor Standards for Contracts Containing Construction Requirements and Option Provisions That Extend the Term of the Contract.
- 22.405 -- Labor Standards for Construction Work Performed Under Facilities Contracts.
- 22.406 -- Administration and Enforcement.
- 22.406-1 -- Policy.
- 22.406-2 -- Wages, Fringe Benefits, and Overtime.
- 22.406-3 -- Additional Classifications.
- 22.406-4 -- Apprentices and Trainees.
- 22.406-5 -- Subcontracts.
- 22.406-6 -- Payrolls and Statements.
- 22.406-7 -- Compliance Checking.
- 22.406-8 -- Investigations.
- 22.406-9 -- Withholding From or Suspension of Contract Payments.
- 22.406-10 -- Disposition of Disputes Concerning Construction Contract Labor Standards Enforcement.
- 22.406-11 -- Contract Terminations.
- 22.406-12 -- Cooperation With the Department of Labor.
- 22.406-13 -- Semiannual Enforcement Reports.
- 22.407 – Solicitation Provision and Contract Clauses.
- Subpart 22.5 -- [Reserved]
- Subpart 22.6 -- Walsh-Healey Public Contracts Act
- 22.601 -- [Reserved]
- 22.602 -- Statutory Requirements.
- 22.603 -- Applicability.
- 22.604 -- Exemptions.
- 22.605 -- Rulings and Interpretations of the Act.
- 22.606 -- [Reserved]
- 22.607 -- [Reserved]
- 22.608 -- Procedures.
- 22.609 -- Regional Jurisdictions of the Department of Labor, Wage and Hour Division.
- 22.610 -- Contract Clause.
- Subpart 22.7 -- [Reserved]
- Subpart 22.8 -- Equal Employment Opportunity
- 22.800 -- Scope of Subpart.
- 22.801 -- Definitions.
- 22.802 -- General.
- 22.803 -- Responsibilities.
- 22.804 -- Affirmative Action Programs.
- 22.805 -- Procedures.
- 22.806 -- Inquiries.
- 22.807 -- Exemptions.
- 22.808 -- Complaints.
- 22.809 -- Enforcement.
- 22.810 -- Solicitation Provisions and Contract Clauses.
- Subpart 22.9 -- Nondiscrimination Because of Age
- Subpart 22.10 -- Service Contract Act of 1965, as Amended
- 22.1000 -- Scope of Subpart.
- 22.1001 -- Definitions.
- 22.1002 -- Statutory Requirements.
- 22.1002-1 -- General.
- 22.1002-2 -- Wage Determinations Based on Prevailing Rates.
- 22.1002-3 -- Wage Determinations Based on Collective Bargaining Agreements.
- 22.1002-4 -- Application of the Fair Labor Standards Act Minimum Wage.
- 22.1003 -- Applicability.
- 22.1003-1 -- General.
- 22.1003-2 -- Geographical Coverage of the Act.
- 22.1003-3 -- Statutory Exemptions.
- 22.1003-4 -- Administrative Limitations, Variations, Tolerances, and Exemptions.
- 22.1003-5 -- Some Examples of Contracts Covered.
- 22.1003-6 -- Repair Distinguished from Remanufacturing of Equipment.
- 22.1003-7 -- Questions Concerning Applicability of the Act.
- 22.1004 -- Department of Labor Responsibilities and Regulations.
- 22.1005 -- [Reserved]
- 22.1006 -- Contract Clauses.
- 22.1007 -- Requirement to Submit Notice (SF 98/98a).
- 22.1008 -- Procedures for Preparing and Submitting Notice (SF 98/98a).
- 22.1008-1 -- Preparation of Notice (SF 98/98a).
- 22.1008-2 -- Preparation of SF 98a.
- 22.1008-3 -- Section 4(c) Successorship with Incumbent Contractor Collective Bargaining Agreement.
- 22.1008-4 -- Procedures When Place of Performance is Unknown.
- 22.1008-5 -- Multiple-Year Contracts.
- 22.1008-6 -- Contract Modifications (Options, Extensions, Changes in Scope) and Anniversary Dates.
- 22.1008-7 -- Required Time of Submission of Notice.
- 22.1009 -- Place of Performance Unknown.
- 22.1009-1 -- General.
- 22.1009-2 -- Attempt to Identify Possible Places of Performance.
- 22.1009-3 -- All Possible Places of Performance Identified.
- 22.1009-4 -- All Possible Places of Performance Not Identified.
- 22.1010 -- Notification to Interested Parties Under Collective Bargaining Agreements.
- 22.1011 -- Response to Notice by Department of Labor.
- 22.1011-1 -- Department of Labor Action.
- 22.1011-2 -- Requests for Status or Expediting of Response.
- 22.1012 -- Late Receipt or Nonreceipt of Wage Determination.
- 22.1012-1 -- General.
- 22.1012-2 -- Response to Timely Submission of Notice -- No Collective Bargaining Agreement.
- 22.1012-3 -- Response to Timely Submission of Notice -- With Collective Bargaining Agreement.
- 22.1012-4 -- Response to Late Submission of Notice -- No Collective Bargaining Agreement.
- 22.1012-5 -- Response to Late Submission of Notice -- With Collective Bargaining Agreement.
- 22.1013 -- Review of Wage Determination.
- 22.1014 -- Delay of Acquisition Dates Over 60 Days.
- 22.1015 -- Discovery of Errors by the Department of Labor.
- 22.1016 -- Statement of Equivalent Rates for Federal Hires.
- 22.1017 -- Notice of Award.
- 22.1018 -- Notification to Contractors and Employees.
- 22.1019 -- Additional Classes of Service Employees.
- 22.1020 -- Seniority Lists.
- 22.1021 -- Request for Hearing.
- 22.1022 -- Withholding of Contract Payments.
- 22.1023 -- Termination for Default.
- 22.1024 -- Cooperation with the Department of Labor.
- 22.1025 -- Ineligibility of Violators.
- 22.1026 -- Disputes Concerning Labor Standards.
- Subpart 22.11 -- Professional Employee Compensation
- 22.1101 -- Applicability.
- 22.1102 -- Definition.
- 22.1103 -- Policy, Procedures, and Solicitation Provision.
- Subpart 22.12 – [Reserved.]
- Subpart 22.13 – Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
- 22.1300 -- Scope of Subpart.
- 22.1301 – Definition.
- 22.1302 -- Policy.
- 22.1303 -- Applicability.
- 22.1304 – Procedures.
- 22.1305 -- Waivers.
- 22.1306 -- Department of Labor Notices and Reports.
- 22.1307 -- Collective Bargaining Agreements.
- 22.1308 -- Complaint Procedures.
- 22.1309 -- Actions Because of Noncompliance.
- 22.1310 – Solicitation Provision and Contract Clauses.
- Subpart 22.14 -- Employment of Workers With Disabilities
- 22.1400 -- Scope of Subpart.
- 22.1401 -- Policy.
- 22.1402 -- Applicability.
- 22.1403 -- Waivers.
- 22.1404 -- Department of Labor Notices.
- 22.1405 -- Collective Bargaining Agreements.
- 22.1406 -- Complaint Procedures.
- 22.1407 -- Actions Because of Noncompliance.
- 22.1408 -- Contract Clause.
- Subpart 22.15 – Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor
- 22.1500 -- Scope.
- 22.1501 – Definitions.
- 22.1502 – Policy.
- 22.1503 – Procedures for Acquiring End Products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor.
- 22.1504 – Violations and Remedies.
- 22.1505 – Solicitation Provision and Contract Clause.
- Subpart 22.16 – Notification of Employee rights Concerning Payment of Union Dues or Fees
(FAC 2005-04)
(8 July 2005)
22.000 -- Scope of Part.
This part --
(a) Deals with general policies regarding contractor labor relations as they pertain to the acquisition process;
(b) Prescribes contracting policy and procedures for implementing pertinent labor laws; and
(c) Prescribes contract clauses with respect to each pertinent labor law.
22.001 -- Definition.
“Administrator” or “Administrator, Wage and Hour Division,” as used in this part, means the--
Administrator
Wage and Hour Division
Employment Standards Administration
U.S. Department of Labor
Washington, DC 20210
or an authorized representative.
Subpart 22.1 -- Basic Labor Policies
22.101 -- Labor Relations.
22.101-1 -- General.
(a) Agencies shall maintain sound relations with industry and labor to ensure
(1) prompt receipt of information involving labor relations that may adversely affect the Government acquisition process and
(2) that the Government obtains needed supplies and services without delay. All matters regarding labor relations shall be handled in accordance with agency procedures.
(b)
(1) Agencies shall remain impartial concerning any dispute between labor and contractor management and not undertake the conciliation, mediation, or arbitration of a labor dispute. To the extent practicable, agencies should ensure that the parties to the dispute use all available methods for resolving the dispute, including the services of the National Labor Relations Board, Federal Mediation and Conciliation Service, the National Mediation Board and other appropriate Federal, State, local, or private agencies.
(2) For use of project labor agreements, see 36.202(d).
(c) Agencies should, when practicable, exchange information concerning labor matters with other affected agencies to ensure a uniform Government approach concerning a particular plant or labor-management dispute.
(d) Agencies should take other actions concerning labor relations problems to the extent consistent with their acquisition responsibilities. For example, agencies should --
(1) Notify the agency responsible for conciliation, mediation, arbitration, or other related action of the existence of any labor dispute affecting or threatening to affect agency acquisition programs;
(2) Furnish to the parties to a dispute factual information pertinent to the dispute’s potential or actual adverse impact on these programs, to the extent consistent with security regulations; and
(3) Seek a voluntary agreement between management and labor, notwithstanding the continuance of the dispute, to permit uninterrupted acquisition of supplies and services. This shall only be done, however, if the attempt to obtain voluntary agreement does not involve the agency in the merits of the dispute and only after consultation with the agency responsible for conciliation, mediation, arbitration, or other related action.
(e) The head of the contracting activity may designate programs or requirements for which it is necessary that contractors be required to notify the Government of actual or potential labor disputes that are delaying or threaten to delay the timely contract performance (see 22.103-5(a)).
22.101-2 -- Contract Pricing and Administration.
(a) Contractor labor policies and compensation practices, whether or not included in labor-management agreements, are not acceptable bases for allowing costs in cost-reimbursement contracts or for recognition of costs in pricing fixed-price contracts if they result in unreasonable costs to the Government. For a discussion of allowable costs resulting from labor-management agreements, see 31.205-6(b).
(b) Labor disputes may cause work stoppages that delay the performance of Government contracts. Contracting officers shall impress upon contractors that each contractor shall be held accountable for reasonably avoidable delays. Standard contract clauses dealing with default, excusable delays, etc., do not relieve contractors or subcontractors from the responsibility for delays that are within the contractors’ or their subcontractors’ control. A delay caused by a strike that the contractor or subcontractor could not reasonably prevent can be excused; however, it cannot be excused beyond the point at which a reasonably diligent contractor or subcontractor could have acted to end the strike by actions such as --
(1) Filing a charge with the National Labor Relations Board to permit the Board to seek injunctive relief in court;
(2) Using other available Government procedures; and
(3) Using private boards or organizations to settle disputes.
(c) Strikes normally result in changing patterns of cost incurrence and therefore may have an impact on the allowability of costs for cost-reimbursement contracts or for recognition of costs in pricing fixed-price contracts. Certain costs may increase because of strikes; e.g., guard services and attorney’s fees. Other costs incurred during a strike may not fluctuate (e.g., “fixed costs” such as rent and depreciation), but because of reduced production, their proportion of the unit cost of items produced increases. All costs incurred during strikes shall be carefully examined to ensure recognition of only those costs necessary for performing the contract in accordance with the Government’s essential interest.
(d) If, during a labor dispute, the inspectors’ safety is not endangered, the normal functions of inspection at the plant of a Government contractor shall be continued without regard to the existence of a labor dispute, strike, or picket line.
22.101-3 -- Reporting Labor Disputes.
The office administering the contract shall report, in accordance with agency procedures, any potential or actual labor disputes that may interfere with performing any contracts under its cognizance. If a contract contains the clause at 52.222-1, Notice to the Government of Labor Disputes, the contractor also must report any actual or potential dispute that may delay contract performance.
22.101-4 -- Removal of Items from Contractors Facilities Affected by Work Stoppages.
(a) Items shall be removed from contractors’ facilities affected by work stoppages in accordance with agency procedures. Agency procedures should allow for the following:
(1) Determine whether removal of items is in the Government’s interest. Normally the determining factor is the critical needs of an agency program.
(2) Attempt to arrange with the contractor and the union representative involved their approval of the shipment of urgently required items.
(3) Obtain appropriate approvals from within the agency.
(4) Determine who will remove the items from the plant(s) involved.
(b) Avoid the use or appearance of force and prevent incidents that might detrimentally affect labor-management relations.
(c) When two or more agencies’ requirements are or may become involved in the removal of items, the contract administration office shall ensure that the necessary coordination is accomplished.
22.102 -- Federal and State Labor Requirements.
22.102-1 -- Policy.
Agencies shall cooperate, and encourage contractors to cooperate with Federal and State agencies responsible for enforcing labor requirements such as --
(a) Safety;
(b) Health and sanitation;
(c) Maximum hours and minimum wages;
(d) Equal employment opportunity;
(e) Child and convict labor;
(f) Age discrimination;
(g) Disabled and Vietnam veteran employment; and
(h) Employment of the handicapped.
22.102-2 -- Administration.
(a) Agencies shall cooperate with, and encourage contractors to use to the fullest extent practicable, the United States Employment Service (USES) and its affiliated local State Employment Service offices in meeting contractors’ labor requirements. These requirements may be to staff new or expanding plant facilities, including requirements for workers in all occupations and skills from local labor market areas or through the Federal-State employment clearance system.
(b) Local State employment offices are operated throughout the United States, Puerto Rico, Guam, and the U.S. Virgin Islands. In addition to providing recruitment assistance to contractors, cooperation with the local State Employment Service offices will further the national program of maintaining continuous assessment of manpower requirements and resources on a national and local basis.
(c) The U.S. Department of Labor is responsible for the administration and enforcement of the Occupational Safety and Health Act.
22.103 -- Overtime.
22.103-1 -- Definition.
“Normal workweek,” as used in this subpart, means, generally, a workweek of 40 hours. Outside the United States and its outlying areas, a workweek longer than 40 hours is considered normal if--
(1) The workweek does not exceed the norm for the area, as determined by local custom, tradition, or law; and
(2) The hours worked in excess of 40 in the workweek are not compensated at a premium rate of pay.
22.103-2 -- Policy.
Contractors shall perform all contracts, so far as practicable, without using overtime, particularly as a regular employment practice, except when lower overall costs to the Government will result or when it is necessary to meet urgent program needs. Any approved overtime, extra-pay shifts, and multi-shifts should be scheduled to achieve these objectives.
22.103-3 -- Procedures.
(a) Solicitations normally shall not specify delivery or performance schedules that may require overtime at Government expense.
(b) In negotiating contracts, contracting officers should, consistent with the Government’s needs, attempt to --
(1) Ascertain the extent that offers are based on the payment of overtime and shift premiums and
(2) Negotiate contract prices or estimated costs without these premiums or obtain the requirement from other sources.
(c) When it becomes apparent during negotiations of applicable contracts (see 22.103-5(b)) that overtime will be required in contract performance, the contracting officer shall secure from the contractor a request for all overtime to be used during the life of the contract, to the extent that the overtime can be estimated with reasonable certainty. The contractor’s request shall contain the information required by paragraph (b) of the clause at 52.222-2, Payment for Overtime Premiums.
22.103-4 -- Approvals.
(a) The contracting officer shall review the contractor’s request for overtime. Approval of the use of overtime may be granted by an agency approving official after determining in writing that overtime is necessary to --
(1) Meet essential delivery or performance schedules;
(2) Make up for delays beyond the control and without the fault or negligence of the contractor; or
(3) Eliminate foreseeable extended production bottlenecks that cannot be eliminated in any other way.
(b) Approval by the designated official of use and total dollar amount of overtime is required before inclusion of an amount in paragraph (a) of the clause at 52.222-2, Payment for Overtime Premiums. This clause is to be inserted in cost-reimbursement contracts over $100,000, except for those exempted under 22.103-5(b).
(c) Contracting officer approval of payment of overtime premiums is required for time-and-materials and labor-hour contracts (see subparagraph (a)(3) of the clause at 52.232-7, Payments Under Time-and-Materials and Labor-Hour Contracts).
(d) No approvals are required for paying overtime premiums under other types of contracts.
(e) Approvals by the agency approving official (see 22.103-4(a)) may be for an individual contract, project, program, plant, division, or company, as practical.
(f) During contract performance, contractor requests for overtime exceeding the amount authorized by paragraph (a) of the clause at 52.222-2, Payment for Overtime Premiums, shall be submitted as stated in paragraph (b) of the clause to the office administering the contract. That office will review the request and if it approves, send the request to the contracting officer. If the contracting officer determines that the requested overtime should be approved in whole or in part, the contracting officer shall request the approval of the agency’s designated approving official and modify paragraph (a) of the clause to reflect any approval.
(g) Overtime premiums at Government expense should not be approved when the contractor is already obligated, without the right to additional compensation, to meet the required delivery date.
(h) When the use of overtime is authorized under a contract, the office administering the contract and the auditor should periodically review the use of overtime to ensure that it is allowable in accordance with the criteria in Part 31. Only overtime premiums for work in those departments, sections, etc., of the contractor’s plant that have been individually evaluated and the necessity for overtime confirmed shall be considered for approval.
(i) Approvals for using overtime shall ordinarily be prospective, but, if justified by emergency circumstances, approvals may be retroactive.
22.103-5 -- Contract Clauses.
(a) The contracting officer shall insert the clause at 52.222-1, Notice to the Government of Labor Disputes, in solicitations and contracts that involve programs or requirements that have been designated under 22.101-1(e).
(b) The contracting officer shall include the clause at 52.222-2, Payment for Overtime Premiums, in solicitations and contracts when a cost-reimbursement contract is contemplated and the contract amount is expected to be over $100,000; unless --
(1) A cost-reimbursement contract for operation of vessels is contemplated; or
(2) A cost-plus- incentive-fee contract that will provide a swing from the target fee of at least plus or minus 3 percent and a contractor’s share of at least 10 percent is contemplated.
Subpart 22.2 -- Convict Labor
22.201 -- General.
(a) Executive Order 11755, December 29, 1973, as amended by Executive Order 12608, September 9, 1987, and Executive Order 12943, December 13, 1994, states: “The development of the occupational and educational skills of prison inmates is essential to their rehabilitation and to their ability to make an effective return to free society. Meaningful employment serves to develop those skills. It is also true, however, that care must be exercised to avoid either the exploitation of convict labor or any unfair competition between convict labor and free labor in the production of goods and services.” The Executive order does not prohibit the contractor, in performing the contract, from employing --
(1) Persons on parole or probation;
(2) Persons who have been pardoned or who have served their terms;
(3) Federal prisoners; or
(4) Nonfederal prisoners authorized to work at paid employment in the community under the laws of a jurisdiction listed in the Executive order if --
(i) The worker is paid or is in an approved work training program on a voluntary basis;
(ii) Representatives of local union central bodies or similar labor union organizations have been consulted;
(iii) Paid employment will not --
(A) Result in the displacement of employed workers;
(B) Be applied in skills, crafts, or trades in which there is a surplus of available gainful labor in the locality; or
(C) Impair existing contracts for services;
(iv) The rates of pay and other conditions of employment will not be less than those for work of a similar nature in the locality where the work is being performed; and
(v) The Attorney General of the United States has certified that the work-release laws or regulations of the jurisdiction involved are in conformity with the requirements of Executive Order 11755, as amended.
(b) Department of Justice regulations authorize the Director of the Bureau of Justice Assistance to exercise the power and authority vested in the Attorney General by the Executive order to certify and to revoke the certification of work-release laws or regulations (see 28 CFR 0.94-1(b)).
22.202 -- Contract Clause.
Insert the clause at 52.222-3, Convict Labor, in solicitations and contracts above the micro-purchase threshold, when the contract is to be performed in the United States, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands; unless --
(a) The contract will be subject to the Walsh-Healey Public Contracts Act (see Subpart 22.6), which contains a separate prohibition against the employment of convict labor;
(b) The supplies or services are to be purchased from Federal Prison Industries, Inc. (see Subpart 8.6); or
(c) The acquisition involves the purchase, from any State prison, of finished supplies that may be secured in the open market or from existing stocks, as distinguished from supplies requiring special fabrication.
Subpart 22.3 -- Contract Work Hours and Safety Standards Act
22.300 -- Scope of Subpart.
This subpart prescribes policies and procedures for applying the requirements of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333) (the Act) to contracts that may require or involve laborers or mechanics. In this subpart, the term “laborers or mechanics” includes apprentices, trainees, helpers, watchmen, guards, firefighters, fireguards, and workmen who perform services in connection with dredging or rock excavation in rivers or harbors, but does not include any employee employed as a seaman.
22.301 -- Statutory Requirement.
The Act requires that certain contracts contain a clause specifying that no laborer or mechanic doing any part of the work contemplated by the contract shall be required or permitted to work more than 40 hours in any workweek unless paid for all such overtime hours at not less than 1 1/2 times the basic rate of pay.
22.302 -- Liquidated Damages and Overtime Pay.
(a) When an overtime computation discloses under-payments, the responsible contractor or subcontractor must pay the affected employee any unpaid wages and pay liquidated damages to the Government. The contracting officer must assess liquidated damages at the rate of $10 per affected employee for each calendar day on which the employer required or permitted the employee to work in excess of the standard workweek of 40 hours without paying overtime wages required by the Act.
(b) If the contractor or subcontractor fails or refuses to comply with overtime pay requirements of the Act and the funds withheld by Federal agencies for labor standards violations do not cover the unpaid wages due laborers and mechanics and the liquidated damages due the Government, make payments in the following order--
(1) Pay laborers and mechanics the wages they are owed (or prorate available funds if they do not cover the entire amount owed); and
(2) Pay liquidated damages.
(c) If the head of an agency finds that the administratively determined liquidated damages due under paragraph (a) of this section are incorrect, or that the contractor or subcontractor inadvertently violated the Act despite the exercise of due care, the agency head may --
(1) Reduce the amount of liquidated damages assessed for liquidated damages of $500 or less;
(2) Release the contractor or subcontractor from the liability for liquidated damages of $500 or less; or
(3) Recommend that the Secretary of Labor reduce or waive liquidated damages over $500.
(d) After the contracting officer determines the liquidated damages and the contractor makes appropriate payments, disburse any remaining assessments in accordance with agency procedures.
22.303 -- Administration and Enforcement.
The procedures and reports required for construction contracts in Subpart 22.4 also apply to investigations of alleged violations of the Act on other than construction contracts.
22.304 -- Variations, Tolerances, and Exemptions.
(a) The Secretary of Labor, under 40 U.S.C. 331, upon the Secretary’s initiative or at the request of any Federal agency, may provide reasonable limitations and allow variations, tolerances, and exemptions to and from any or all provisions of the Act (see 29 CFR 5.15).
(b) The Secretary of Labor may make variations, tolerances, and exemptions from the regulatory requirements of applicable parts of 29 CFR when the Secretary finds that such action is necessary and proper in the public interest or to prevent injustice and undue hardship (see 29 CFR 5.14).
22.305 -- Contract Clause.
Insert the clause at 52.222-4, Contract Work Hours and Safety Standards Act -- Overtime Compensation, in solicitations and contracts (including, for this purpose, basic ordering agreements) when the contract may require or involve the employment of laborers or mechanics. However, do not include the clause in solicitations and contracts--
(a) Valued at or below the simplified acquisition threshold.
(b) For commercial items;
(c) For transportation or the transmission of intelligence;
(d) To be performed outside the United States, Puerto Rico, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and Outer Continental Shelf Lands as defined in the Outer Continental Shelf Lands Act (43 U.S.C.1331) (29 CFR 5.15);
(e) For work to be done solely in accordance with the Walsh-Healey Public Contracts Act (see Subpart 22.6);
(f) For supplies that include incidental services that do not require substantial employment of laborers or mechanics; or
(g) Exempt under regulations of the Secretary of Labor (29 CFR 5.15).
Subpart 22.4 -- Labor Standards for Contracts Involving Construction
22.400 -- Scope of Subpart.
This subpart implements the statutes which prescribe labor standards requirements for contracts in excess of $2,000 for construction, alteration, or repair, including painting and decorating, of public buildings and public works. (See definition of “Construction, alteration, or repair” in section 22.401.) Labor relations requirements prescribed in other subparts of Part 22 may also apply.
22.401 -- Definitions.
As used in this subpart—
“Apprentice” means a person—
(1) Employed and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS), or with a State Apprenticeship Agency recognized by OATELS; or
(2) Who is in the first 90 days of probationary employment as an apprentice in an apprenticeship program, and is not individually registered in the program, but who has been certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment apprentice.
“Building or work” means construction activity as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The terms include, without limitation, buildings, structures, and improvements of all types, such as bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, canals, dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and landscaping. The manufacture or furnishing of materials, articles, supplies, or equipment (whether or not a Federal or State agency acquires title to such materials, articles, supplies, or equipment during the course of the manufacture or furnishing, or owns the materials from which they are manufactured or furnished) is not “building” or “work” within the meaning of the regulations in this subpart unless conducted in connection with and at the site of such building or work as is described in the foregoing sentence, or under the United States Housing Act of 1937 and the Housing Act of 1949 in the construction or development of the project.
“Construction, alteration, or repair” means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations—
(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;
(2) Painting and decorating;
(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;
(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (1)(i) and (ii) of the “site of the work” definition of this section, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of work” definition of this section; and
(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (1)(ii) of this section, and the physical place or places where the building or work will remain (paragraph (1)(i) in the “site of the work” definition of this section).
“Laborers or mechanics”—
(1) Means—
(i) Workers, utilized by a contractor or subcontractor at any tier, whose duties are manual or physical in nature (including those workers who use tools or who are performing the work of a trade), as distinguished from mental or managerial;
(ii) Apprentices, trainees, helpers, and, in the case of contracts subject to the Contract Work Hours and Safety Standards Act, watchmen and guards;
(iii) Working foremen who devote more than 20 percent of their time during a workweek performing duties of a laborer or mechanic, and who do not meet the criteria of 29 CFR Part 541, for the time so spent; and
(iv) Every person performing the duties of a laborer or mechanic regardless of any contractual relationship alleged to exist between the contractor and those individuals; and
(2) Does not include workers whose duties are primarily executive, supervisory (except as provided in paragraph (1)(iii) of this definition), administrative, or clerical, rather than manual. Persons employed in a bona fide executive, administrative, or professional capacity as defined in 29 CFR Part 541 are not deemed to be laborers or mechanics.
“Public building” or “public work” means building or work, the construction, prosecution, completion, or repair of which, as defined in this section, is carried on directly by authority of, or with funds of, a Federal agency to serve the interest of the general public regardless of whether title thereof is in a Federal agency.
“Site of the work”—
(1) Means—
(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and
(ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is—
(A) Located in the United States; and
(B) Established specifically for the performance of the contract or project;
(2) Except as provided in paragraph (3) of this definition, includes fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided—
(i) They are dedicated exclusively, or nearly so, to performance of the contract or project; and
(ii) They are adjacent or virtually adjacent to the “primary site of the work” as defined in paragraphs (1)(i) of “the secondary site of the work” as defined in paragraph (1)(ii) of this definition;
(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the project site, are not included in the “site of the work.” Such permanent, previously established facilities are not a part of the “site of the work,” even if the operations for a period of time may be dedicated exclusively, or nearly so, to the performance of a contract.
“Trainee” means a person registered and receiving on-the-job training in a construction occupation under a program which has been approved in advance by the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS), as meeting its standards for on-the-job training programs and which has been so certified by that Administration.
“Wages” means the basic hourly rate of pay; any contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a bona fide fringe benefit fund, plan, or program; and the rate of costs to the contractor or subcontractor which may be reasonably anticipated in providing bonafide fringe benefits to laborers and mechanics pursuant to an enforceable commitment to carry out a financially responsible plan or program, which was communicated in writing to the laborers and mechanics affected. The fringe benefits enumerated in the Davis-Bacon Act include medical or hospital care, pensions on retirement or death, compensation for injuries or illness resulting from occupational activity, or insurance to provide any of the foregoing; unemployment benefits; life insurance, disability insurance, sickness insurance, or accident insurance; vacation or holiday pay; defraying costs of apprenticeship or other similar programs; or other bona fide fringe benefits. Fringe benefits do not include benefits required by other Federal, State, or local law.
22.402 -- Applicability.
(a) Contracts for construction work.
(1) The requirements of this subpart apply --
(i) Only if the construction work is, or reasonably can be foreseen to be, performed at a particular site so that wage rates can be determined for the locality, and only to construction work that is performed by laborers and mechanics at the site of the work;
(ii) To dismantling, demolition, or removal of improvements if a part of the construction contract, or if construction at that site is anticipated by another contract as provided in Subpart 37.3;
(iii) To the manufacture or fabrication of construction materials and components conducted in connection with the construction and on the site of the work by the contractor or a subcontractor under a contract otherwise subject to this subpart; and
(iv) To painting of public buildings or public works, whether performed in connection with the original construction or as alteration or repair of an existing structure.
(2) The requirements of this subpart do not apply to --
(i) The manufacturing of components or materials off the site of the work or their subsequent delivery to the site by the commercial supplier or material man;
(ii) Contracts requiring construction work that is so closely related to research, experiment, and development that it cannot be performed separately, or that is itself the subject of research, experiment, or development (see paragraph (b) of this section for applicability of this subpart to research and development contracts or portions thereof involving construction, alteration, or repair of a public building or public work);
(iii) Employees of railroads operating under collective bargaining agreements that are subject to the Railway Labor Act; or
(iv) Employees who work at contractors’ or subcontractors’ permanent home offices, fabrication shops, or tool yards not located at the site of the work. However, if the employees go to the site of the work and perform construction activities there, the requirements of this subpart are applicable for the actual time so spent, not including travel unless the employees transport materials or supplies to or from the site of the work.
(b) Nonconstruction contracts involving some construction work.
(1) The requirements of this subpart apply to construction work to be performed as part of nonconstruction contracts (supply, service, research and development, etc.) if --
(i) The construction work is to be performed on a public building or public work;
(ii) The contract contains specific requirements for a substantial amount of construction work exceeding the monetary threshold for application of the Davis-Bacon Act (the word “substantial” relates to the type and quantity of construction work to be performed and not merely to the total value of construction work as compared to the total value of the contract); and
(iii) The construction work is physically or functionally separate from, and is capable of being performed on a segregated basis from, the other work required by the contract.
(2) The requirements of this subpart do not apply if --
(i) The construction work is incidental to the furnishing of supplies, equipment, or services (for example, the requirements do not apply to simple installation or alteration at a public building or public work that is incidental to furnishing supplies or equipment under a supply contract; however, if a substantial and segregable amount of construction, alteration, or repair is required, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or
(ii) The construction work is so merged with non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement.
22.403 -- Statutory and Regulatory Requirements.
22.403-1 -- Davis-Bacon Act.
The Davis-Bacon Act (40 U.S.C. 276a-276a-7) provides that contracts in excess of $2,000 to which the United States or the District of Columbia is a party for construction, alteration, or repair (including painting and decorating) of public buildings or public works within the United States, shall contain a clause (see 52.222-6) that no laborer or mechanic employed directly upon the site of the work shall receive less than the prevailing wage rates as determined by the Secretary of Labor.
22.403-2 -- Copeland Act.
The Copeland (Anti-Kickback) Act (18 U.S.C. 874 and 40 U.S.C. 276c) makes it unlawful to induce, by force, intimidation, threat of procuring dismissal from employment, or otherwise, any person employed in the construction or repair of public buildings or public works, financed in whole or in part by the United States, to give up any part of the compensation to which that person is entitled under a contract of employment. The Copeland Act also requires each contractor and subcontractor to furnish weekly a statement of compliance with respect to the wages paid each employee during the preceding week. Contracts subject to the Copeland Act shall contain a clause (see 52.222-10) requiring contractors and subcontractors to comply with the regulations issued by the Secretary of Labor under the Copeland Act.
22.403-3 -- Contract Work Hours and Safety Standards Act.
The Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333) requires that certain contracts (see 22.305) contain a clause (see 52.222-4) specifying that no laborer or mechanic doing any part of the work contemplated by the contract shall be required or permitted to work more than 40 hours in any workweek unless paid for all additional hours at not less than 1 1/2 times the basic rate of pay (see 22.301).
22.403-4 -- Department of Labor Regulations.
(a) Under the statutes referred to in this 22.403 and Reorganization Plan No. 14 of 1950 (3 CFR 1949-53 Comp., p. 1007), the Secretary of Labor has issued regulations in Title 29, Subtitle A, Code of Federal Regulations, prescribing standards and procedures to be observed by the Department of Labor and the Federal contracting agencies. Those standards and procedures applicable to contracts involving construction are implemented in this subpart.
(b) The Department of Labor regulations include--
(1) Part 1, relating to Davis-Bacon Act minimum wage rates;
(2) Part 3, relating to the Copeland (Anti-Kickback) Act and requirements for submission of weekly statements of compliance and the preservation and inspection of weekly payroll records;
(3) Part 5, relating to enforcement of the Davis-Bacon Act, Contract Work Hours and Safety Standards Act, and Copeland (Anti-Kickback) Act;
(4) Part 6, relating to rules of practice for appealing the findings of the Administrator, Wage and Hour Division, in enforcement cases under the Davis-Bacon Act, Contract Work Hours and Safety Standards Act, Copeland (Anti-Kickback) Act, and Service Contract Act, and by which Administrative Law Judge hearings are held; and
(5) Part 7, relating to rules of practice by which contractors and other interested parties may appeal to the Department of Labor Administrative Review Board, decisions issued by the Administrator, Wage and Hour Division, or administrative law judges under the Davis-Bacon Act, Contract Work Hours and Safety Standards Act, or Copeland (Anti-Kickback) Act.
(c) Refer all questions relating to the application and interpretation of wage determinations (including the classifications therein) and the interpretation of the Department of Labor regulations in this subsection to the Administrator, Wage and Hour Division.
22.404 -- Davis-Bacon Act Wage Determinations.
The Department of Labor is responsible for issuing wage determinations reflecting prevailing wages, including fringe benefits. The wage determinations apply only to those laborers and mechanics employed by a contractor upon the site of the work including drivers who transport to or from the site materials and equipment used in the course of contract operations. Determinations are issued for different types of construction, such as building, heavy, highway, and residential (referred to as rate schedules), and apply only to the types of construction designated in the determination.
22.404-1 -- Types of Wage Determinations.
(a) General wage determinations.
(1) A general wage determination contains prevailing wage rates for the types of construction designated in the determination, and is used in contracts performed within a specified geographical area. General wage determinations contain no expiration date and remain valid until modified, superseded, or canceled by a notice in the Federal Register by the Department of Labor. Once incorporated in a contract, a general wage determination normally remains effective for the life of the contract, unless the contracting officer exercises an option to extend the term of the contract (see 22.404-12).. These determinations shall be used whenever possible. They are issued at the discretion of the Department of Labor either upon receipt of an agency request or on the Department of Labor’s own initiative.
(2) General wage determinations are published weekly in the Government Printing Office (GPO) document entitled “General Wage Determinations Issued Under the Davis-Bacon and Related Acts.” Notices of general wage determinations are published in the Federal Register. General wage determinations are effective on the publication date of the notice or upon receipt of the determination by the contracting agency, whichever occurs first.
(3) The GPO publication is available for examination at each of the 50 Regional Government Depository Libraries and many other of the 1,400 Government Depository Libraries across the country. Subscriptions may be obtained by contacting:
Superintendent of Documents
U.S. Government Printing Office
Washington, DC 20402
The GPO publication is divided into three volumes East, Central, and West, which may be ordered separately. The States covered by each volume are as follows:
Volume I -- East
Alabama Maryland Rhode Island
Connecticut Massachusetts South Carolina
Delaware Mississippi Tennessee
District of Columbia New Hampshire Vermont
Florida New Jersey Virginia
Georgia New York Virgin Islands
Kentucky North Carolina West Virginia
Maine Pennsylvania Puerto Rico
Volume II -- Central
Arkansas Louisiana New Mexico
Illinois Michigan Ohio
Iowa Minnesota Oklahoma
Indiana Missouri Texas
Kansas Nebraska Wisconsin
Volume III- West
Alaska Hawaii Oregon
Arizona Idaho South Dakota
California Montana Utah
Colorado Nevada Washington
Guam North Dakota Wyoming
(4) On or about January 1 of each year, an annual edition will be issued that includes all current general wage determinations for the States covered by each volume. Throughout the remainder of the year, regular weekly updates will be distributed providing any modifications or superseded wage determinations issued. Each volume’s annual and weekly editions will be provided in loose-leaf format.
(b) Project wage determinations. A project wage determination is issued at the specific request of a contracting agency. It is used only when no general wage determination applies, and is effective for 180 calendar days from the date of the determination. However, if a determination expires before contract award, it may be possible to obtain an extension to the 180-day life of the determination (see 22.404-5(b)(2)). Once incorporated in a contract, a project wage determination normally remains effective for the life of the contract, unless the contracting officer exercises an option to extend the term of the contract (see 22.404-12).
22.404-2 -- General Requirements.
(a) The contracting officer must incorporate only the appropriate wage determinations in solicitations and contracts and must designate the work to which each determination or part thereof applies. The contracting officer must not include project wage determinations in contracts or options other than those for which they are issued. When exercising an option to extend the term of a contract, the contracting officer must select the most current wage determination(s) from the same schedule(s) as the wage determination(s) incorporated into the contract.
(b) If the wage determination is a general wage determination or a project wage determination containing more than one rate schedule, the contracting officer shall either include only the rate schedules that apply to the particular types of construction (building, heavy, highway, etc.) or include the entire wage determination and clearly indicate the parts of the work to which each rate schedule shall be applied. Inclusion by reference is not permitted.
(c) The Wage and Hour Division has issued the following general guidelines for use in selecting the proper schedule(s) of wage rates:
(1) Building construction is generally the construction of sheltered enclosures with walk-in access, for housing persons, machinery, equipment, or supplies. It typically includes all construction of such structures, installation of utilities and equipment (both above and below grade level), as well as incidental grading, utilities and paving, unless there is an established area practice to the contrary.
(2) Residential construction is generally the construction, alteration, or repair of single family houses or apartment buildings of no more than four (4) stories in height, and typically includes incidental items such as site work, parking areas, utilities, streets and sidewalks, unless there is an established area practice to the contrary.
(3) Highway construction is generally the construction, alteration, or repair of roads, streets, highways, runways, taxiways, alleys, parking areas, and other similar projects that are not incidental to “building,” “residential,” or “heavy” construction.
(4) Heavy construction includes those projects that are not properly classified as either “building,” “residential,” or “highway,” and is of a catch-all nature. Such heavy projects may sometimes be distinguished on the basis of their individual characteristics, and separate schedules issued (e.g., “dredging,” “water and sewer line,” “dams,” “flood control,” etc.).
(5) When the nature of a project is not clear, it is necessary to look at additional factors, with primary consideration given to locally established area practices. If there is any doubt as to the proper application of wage rate schedules to the type or types of construction involved, guidance shall be sought before the opening of bids, or receipt of best and final offers, from the Administrator, Wage and Hour Division. Further examples are contained in Department of Labor All Agency Memoranda Numbers 130 and 131.
22.404-3 -- Procedures for Requesting Wage Determinations.
(a) Requests for general wage determinations. If there is a general wage determination applicable to the project, the agency may use it without notifying the Department of Labor. When necessary, a request for a general wage determination may be made by submitting Standard Form (SF) 308, Request for Determination and Response to Request, to the Administrator, Wage and Hour Division, attention: Branch of Construction Contract Wage Determinations.
(b) Requests for project wage determinations. A contracting agency shall submit requests for project wage determinations on SF 308 to the Department of Labor. The requests shall include the following information:
(1) The location, including the county (or other civil subdivision) and State in which the proposed project is located.
(2) The name of the project and a sufficiently detailed description of the work to indicate the types of construction involved (e.g., building, heavy, highway, residential, or other type).
(3) Any available pertinent wage payment information, unless wage patterns in the area are clearly established.
(4) The estimated cost of each project.
(5) All the classifications of laborers and mechanics likely to be employed.
(c) Time for submission of requests.
(1) The time required by the Department of Labor for processing requests for project wage determinations varies according to the facts and circumstances in each case. An agency should expect the processing to take at least 30 days. Accordingly, agencies should submit requests for project wage determinations for the primary site of the work to the Department of Labor at least 45 days (60 days if possible) before issuing the solicitation or exercising an option to extend the term of a contract.
(2) Agencies should promptly submit to the Department of Labor an offeror’s request for a project wage determination for a secondary site of the work.
(d) Review of wage determinations. Immediately upon receipt, the contracting agency shall examine the wage determination and inform the Department of Labor of any changes necessary or appropriate to correct errors. Private parties requesting changes should be advised to submit their requests to the Department of Labor.
22.404-4 -- Solicitations Issued Without Wage Determinations for the Primary Site of the Work.
(a) If a solicitation is issued before the wage determination for the primary site of the work is obtained, a notice shall be included in the solicitation that the schedule of minimum wage rates to be paid under the contract will be issued as an amendment to the solicitation.
(b) In sealed bidding, bids may not be opened until a reasonable time after the wage determination for the primary site of the work has been furnished to all bidders.
(c) In negotiated acquisitions, the contracting officer may open proposals and conduct negotiations before obtaining the wage determination for the primary site of the work. However, the contracting officer shall incorporate the wage determination for the primary site of the work into the solicitation before submission of best and final offers.
22.404-5 -- Expiration of Project Wage Determinations.
(a) The contracting officer shall make every effort to ensure that contract award is made before expiration of the project wage determination included in the solicitation.
(b) The following procedure applies when contracting by sealed bidding:
(1) If a project wage determination for the primary site of the work expires before bid opening, or if it appears before bid opening that a project wage determination may expire before award, the contracting officer shall request a new determination early enough to ensure its receipt before bid opening. If necessary, the contracting officer shall postpone the bid opening date to allow a reasonable time to obtain the determination, amend the solicitation to incorporate the new determination, and permit bidders to amend their bids. If the new determination does not change the wage rates and would not warrant amended bids, the contracting officer shall amend the solicitation to include the number and date of the new determination.
(2) If a project wage determination for the primary site of the work expires after bid opening but before award, the contracting officer shall request an extension of the project wage determination expiration date from the Administrator, Wage and Hour Division. The request for extension shall be supported by a written finding, which shall include a brief statement of factual support, that the extension is necessary and proper in the public interest to prevent injustice or undue hardship or to avoid serious impairment of the conduct of Government business. If necessary, the contracting officer shall delay award to permit either receipt of the extension or receipt and processing of a new determination. If the request is granted, the contracting officer shall award the contract and modify it to apply the extended expiration date to the already incorporated project wage determination. (See 43.103(b)(1).) If the request is denied, the Administrator will proceed to issue a new project wage determination. Upon receipt, the contracting officer shall process the new determination as follows:
(i) If the new determination for the primary site of the work changes any wage rates for classifications to be used in the contract, the contracting officer may cancel the solicitation only in accordance with 14.404-1. Otherwise the contracting officer shall award the contract and incorporate the new determination to be effective on the date of contract award. The contracting officer shall equitably adjust the contract price for any increased or decreased cost of performance resulting from any changed wage rates.
(ii) If the new determination for the primary site of the work does not change any wage rates, the contracting officer shall award the contract and modify it to include the number and date of the new determination. (See 43.103(b)(1).)
(c) The following procedure applies when contracting by negotiation:
(1) If a project wage determination will or does expire before contract award, the contracting officer shall request a new wage determination from the Department of Labor. If necessary, the contracting officer shall delay award while the new determination is obtained and processed.
(2) The contracting officer need not delay opening and reviewing proposals or discussing them with the offerors while a new determination for the primary site of the work is being obtained. The contracting officer shall request offerors to extend the period for acceptance of any proposal if that period expires or may expire before receipt and full processing of the new determination.
(3) If the new determination for the primary site of the work changes any wage rates, the contracting officer shall amend the solicitation to incorporate the new determination, and furnish the wage rate information to all prospective offerors that were sent a solicitation if the closing date for receipt of proposals has not yet occurred, or to all offerors that submitted proposals if the closing date has passed. All offerors to whom wage rate information has been furnished shall be given reasonable opportunity to amend their proposals.
(4) If the new determination for the primary site of the work does not change any wage rates, the contracting officer shall amend the solicitation to include the number and date of the new determination and award the contract.
22.404-6 -- Modifications of Wage Determinations.
(a) General.
(1) The Department of Labor may modify a wage determination to make it current by specifying only the items being changed or by reissuing the entire determination with changes incorporated.
(2) All project wage determination modifications expire on the same day as the original determination. The need to include a modification of a project wage determination for the primary site of the work in a solicitation is determined by the time of receipt of the modification by the contracting agency. Therefore, the contracting agency must annotate the modification of the project wage determination with the date and time immediately upon receipt.
(3) The need for inclusion of the modification of a general wage determination for the primary site of the work in a solicitation is determined by the publication date of the notice in the Federal Register, or by the time of receipt of the modification (annotated with the date and time immediately upon receipt) by the contracting agency, whichever occurs first. (Note the distinction between receipt by the agency (modification is effective) and receipt by the contracting officer, which may occur later.)
(b) The following applies when contracting by sealed bidding:
(1) A written action modifying a wage determination shall be effective if:
(i) It is received by the contracting agency, or notice of the modification is published in the Federal Register, 10 or more calendar days before the date of bid opening, or
(ii) It is received by the contracting agency, or notice of the modification is published in the Federal Register, less than 10 calendar days before the date of bid opening, unless the contracting officer finds that there is not reasonable time available before bid opening to notify the prospective bidders. (If the contracting officer finds that there is not reasonable time to notify bidders, a written report of the finding shall be placed in the contract file and shall be made available to the Department of Labor upon request.)
(2) All written actions modifying wage determinations received by the contracting agency after bid opening, or modifications to general wage determinations, notices of which are published in the Federal Register after bid opening, shall not be effective and shall not be included in the solicitation (but see subparagraph (b)(6) of this subsection).
(3) If an effective modification of the wage determination for the primary site of the work is received by the contracting officer before bid opening, the contracting officer shall postpone the bid opening, if necessary, to allow a reasonable time to amend the solicitation to incorporate the modification and permit bidders to amend their bids. If the modification does not change the wage rates and would not warrant amended bids, the contracting officer shall amend the solicitation to include the number and date of the modification.
(4) If an effective modification of the wage determination for the primary site of the work is received by the contracting officer after bid opening, but before award, the contracting officer shall follow the procedures in 22.404-5(b)(2)(i) or (ii).
(5) If an effective modification is received by the contracting officer after award, the contracting officer shall modify the contract to incorporate the wage modification retroactive to the date of award and equitably adjust the contract price for any increased or decreased cost of performance resulting from any changed wage rates. If the modification does not change any wage rates and would not warrant contract price adjustment, the contracting officer shall modify the contract to include the number and date of the modification.
(6) If an award is not made within 90 days after bid opening, any modification to a general wage determination, notice of which is published in the Federal Register before award, shall be effective for any resultant contract unless an extension of the 90-day period is obtained from the Administrator, Wage and Hour Division. An agency head or a designee may request such an extension from the Administrator. The request must be supported by a written finding, which shall include a brief statement of factual support, that the extension is necessary and proper in the public interest to prevent injustice, undue hardship, or to avoid serious impairment in the conduct of Government business. The contracting officer shall follow the procedures in 22.404-5(b)(2).
(c) The following applies when contracting by negotiation:
(1) All written actions modifying wage determinations received by the contracting agency before contract award, or modifications to general wage determinations notices of which are published in the Federal Register before award, shall be effective.
(2) If an effective wage modification is received by the contracting officer before award, the contracting officer shall follow the procedures in 22.404-5(c)(3) or (4).
(3) If an effective wage modification is received by the contracting officer after award, the contracting officer shall follow the procedures in 22.404-6(b)(5).
(d) The following applies when modifying a contract to exercise an option to extend the term of a contract:
(1) A modified wage determination if effective if--
(i) The contracting agency receives a written action from the Department of Labor prior to exercise of the option, or within 45 days after submission of a wage determination request (22.404-3(c)), whichever is later; or
(ii) The Department of Labor publishes notice of modifications to general wage determinations in the Federal Register before exercise of the option.
(2) If the contracting officer receives an effective modified wage determination either before or after execution of the contract modification to exercise the option, the contracting officer must modify the contract to incorporate the modified wage determination, and any changed wage rates, effective as of the date that the option to extend was effective.
22.404-7 -- Correction of Wage Determinations Containing Clerical Errors.
Upon the Department of Labor’s own initiative or at the request of the contracting agency, the Administrator, Wage and Hour Division, may correct any wage determination found to contain clerical errors. Such corrections will be effective immediately, and will apply to any solicitation or active contract. Before contract award, the contracting officer must follow the procedures in 22.404-5(b)(1) or (2)(i) or (ii) in sealed bidding, and the procedures in 22.404-5(c)(3) or (4) in negotiations. After contract award, the contracting officer must follow the procedures at 22.404-6(b)(5),except that for contract modifications to exercise an option to extend the term of the contract, the contracting officer must follow the procedures at 22.404-6(d)(2).
22.404-8 -- Notification of Improper Wage Determination Before Award.
(a) The following written notifications by the Department of Labor shall be effective immediately without regard to 22.404-6 if received by the contracting officer prior to award:
(1) A solicitation includes the wrong wage determination or the wrong rate schedule or
(2) A wage determination is withdrawn by the Administrative Review Board.
(b) In sealed bidding, the contracting officer shall proceed in accordance with the following:
(1) If the notification of an improper wage determination for the primary site of the work reaches the contracting officer before bid opening, the contracting officer shall postpone the bid opening date, if necessary, to allow a reasonable time to --
(i) Obtain the appropriate determination if a new wage determination is required,
(ii) Amend the solicitation to incorporate the determination (or rate schedule), and
(iii) Permit bidders to amend their bids. If the appropriate wage determination does not change any wage rates and would not warrant amended bids, the contracting officer shall amend the solicitation to include the number and date of the new determination.
(2) If the notification of an improper wage determination for the primary site of the work reaches the contracting officer after bid opening but before award, the contracting officer shall delay awarding the contract, if necessary, and if required, obtain the appropriate wage determination. The appropriate wage determination shall be processed in accordance with 22.404-5(b)(2)(i) or (ii).
(c) In negotiated acquisitions, the contracting officer shall delay award, if necessary, and process the notification of an improper wage determination for the primary site of the work in the manner prescribed for a new wage determination at 22.404-5(c)(3).
22.404-9 -- Award of Contract Without Required Wage Determination.
(a) If a contract is awarded without the required wage determination (i.e., incorporating no determination, containing a clearly inapplicable general wage determination, or containing a project determination which is inapplicable because of an inaccurate description of the project or its location), the contracting officer shall initiate action to incorporate the required determination in the contract immediately upon discovery of the error. If a required wage determination (valid determination in effect on the date of award) is not available, the contracting officer shall expeditiously request a wage determination from the Department of Labor, including a statement explaining the circumstances and giving the date of the contract award.
(b) The contracting officer shall --
(1) Modify the contract to incorporate the required wage determination (retroactive to the date of award) and equitably adjust the contract price if appropriate; or
(2) Terminate the contract.
22.404-10 -- Posting Wage Determinations and Notice.
The contractor must keep a copy of the applicable wage determination (and any approved additional classifications) posted at the site of the work in a prominent place where the workers can easily see it. The contracting officer shall furnish to the contractor, Department of Labor Form WH-1321, Notice to Employees Working on Federal and Federally Financed Construction Projects, for posting with the wage rates. The name, address, and telephone number of the Government officer responsible for the administration of the contract shall be indicated in the poster to inform workers to whom they may submit complaints or raise questions concerning labor standards.
22.404-11 -- Wage Determination Appeals.
The Secretary of Labor has established an Administrative Review Board which decides appeals of final decisions made by the Department of Labor concerning Davis-Bacon Act wage determinations. A contracting agency or other interested party may file a petition for review under the procedures in 29 CFR Part 7 if reconsideration by the Administrator has been sought pursuant to 29 CFR 1.8 and denied.
22.404-12 – Labor Standards for Contracts Containing Construction Requirements and Option Provisions That Extend the Term of the Contract.
(a) Each time the contracting officer exercises an option to extend the term of a contract for construction, or a contract that includes substantial and segregable construction work, the contracting officer must modify the contract to incorporate the most current wage determination.
(b) If a contract with an option to extend the term of the contract has indefinite-delivery or indefinite-quantity construction requirements, the contracting officer must incorporate the wage determination incorporated into the contract at the exercise of the option into task orders issued during that option period. The wage determination will be effective for the complete period of performance of those task orders without further revision.
(c) The contracting officer must include in fixed-price contracts a clause that specifies one of the following methods, suitable to the interest of the Government, to provide an allowance for any increases or decreases in labor costs that result from the inclusion of the current wage determination at the exercise of an option to extend the term of the contract:
(1) The contracting officer may provide the offerors the opportunity to bid or propose separate prices for each option period. The contracting officer must not further adjust the contract price as a result of the incorporation of a new or revised wage determination at the exercise of each option to extend the term of the contract. Generally, this method is used in construction-only contracts (with options to extend the term) that are not expected to exceed a total of 3 years.
(2) The contracting officer may include in the contract a separately specified pricing method that permits an adjustment to the contract price or contract labor unit price at the exercise of each option to extend the term of the contract. At the time of option exercise, the contracting officer must incorporate a new wage determination into the contract, and must apply the specific pricing method to calculate the contract price adjustment. An example of a contract pricing method that the contracting officer might separately specify is incorporation in the solicitation and resulting contract of the pricing data from a annually published unit pricing book (e.g., the R.S. Means Cost Estimating System, or the U.S. Army Computer-Aided Cost Estimating System), which is multiplied in the contract by a factor proposed by the contractor (e.g., .95 or 1.1). At option exercise, the contracting officer incorporates the pricing data from the latest annual edition of the unit pricing book, multiplied by the factor agreed to in the basic contract. The contracting officer must not further adjust the contract price as a result of the incorporation of the new or revised wage determination.
(3) The contracting officer may provide for a contract price adjustment based solely on a percentage rate determined by the contracting officer using a published economic indicator incorporated into the solicitation and resulting contract. At the exercise of each option to extend the term of the contract, the contracting officer will apply the percentage rate, based on the economic indicator, to the portion of the contract price or contract unit price designated in the contract clause as labor costs subject to the provision of the Davis-Bacon Act. The contracting officer must insert 50 percent as the estimated portion of the contract price that is labor unless the contracting officer determines, prior to issuance of the solicitation, that a different percentage is more appropriate for a particular contract or requirement. This percentage adjustment to the designated labor costs must be the only adjustment made to cover increases in wages and/or benefits resulting from the incorporation of a new or revised wage determination at the exercise of the option.
(4) The contracting officer may provide a computation method to adjust the contract price to reflect the contractor’s actual increase or decrease in wages and fringe benefits (combined) to the extent that the increase is made to comply with, or the decrease is voluntarily made by the contractor as a result of incorporation of, a new or revised wage determination at the exercise of the option to extend the term of the contract. Generally, this method is appropriate for use only if contract requirements are predominately services subject to the Service Contract Act and the construction requirements are substantial and segregable. The methods used to adjust the contract price for the service requirements and the construction requirements would be similar.
22.405 -- Labor Standards for Construction Work Performed Under Facilities Contracts.
If it is not certain at the time of contract award that construction work may be required under a facilities contract (see 45.301), the clause at 52.222-17, Labor Standards for Construction Work Facilities Contracts (see 22.407(c)), shall be included in the contract. When covered construction work is necessary after contract award, the contracting officer shall obtain the appropriate wage determination and incorporate it in the contract and identify the item or items of construction work to which the clauses apply.
22.406 -- Administration and Enforcement.
22.406-1 -- Policy.
(a) General. Contracting agencies are responsible for ensuring the full and impartial enforcement of labor standards in the administration of construction contracts. Contracting agencies shall maintain an effective program that shall include --
(1) Ensuring that contractors and subcontractors are informed, before commencement of work, of their obligations under the labor standards clauses of the contract;
(2) Adequate payroll reviews, on-site inspections, and employee interviews to determine compliance by the contractor and subcontractors, and prompt initiation of corrective action when required;
(3) Prompt investigation and disposition of complaints; and
(4) Prompt submission of all reports required by this subpart.
(b) Preconstruction letters and conferences. Before construction begins, the contracting officer shall inform the contractor of the labor standards clauses and wage determination requirements of the contract and of the contractor’s and any subcontractor’s responsibilities under the contract. Unless it is clear that the contractor is fully aware of the requirements, the contracting officer shall issue an explanatory letter and/or arrange a conference with the contractor promptly after award of the contract.
22.406-2 -- Wages, Fringe Benefits, and Overtime.
(a) In computing wages paid to a laborer or mechanic, the contractor may include only the following items:
(1) Amounts paid in cash to the laborer or mechanic, or deducted from payments under the conditions set forth in 29 CFR 3.5.
(2) Contributions (except those required by Federal, State, or local law) the contractor makes irrevocably to a trustee or a third party under any bona fide plan or program to provide for medical or hospital care, pensions, compensation for injuries or illness resulting from occupational activity, unemployment benefits, life insurance, disability and sickness insurance, accident insurance, or any other bona fide fringe benefit.
(3) Other contributions or anticipated costs for bona fide fringe benefits to the extent expressly approved by the Secretary of Labor.
(b)
(1) The contractor may satisfy the obligation under the clause at 52.222-6, Davis-Bacon Act, by providing wages consisting of any combination of contributions or costs as specified in paragraph (a) of this subsection, if the total cost of the combination is not less than the total of the basic hourly rate and fringe benefits payments prescribed in the wage determination for the classification of laborer or mechanic concerned.
(2) Wages provided by the contractor and fringe benefits payments required by the wage determination may include items that are not stated as exact cash amounts. In these cases, the hourly cash equivalent of the cost of these items shall be determined by dividing the employer’s contributions or costs by the employee’s hours worked during the period covered by the costs or contributions. For example, if a contractor pays a monthly health insurance premium of $112 for a particular employee who worked 125 hours during the month, the hourly cash equivalent is determined by dividing $112 by 125 hours, which equals $0.90 per hour. Similarly, the calculation of hourly cash equivalent for nine paid holidays per year for an employee with a hourly rate of pay of $5.00 is determined by multiplying $5.00 by 72 (9 days at 8 hours each), and dividing the result of $360 by the number of hours worked by the employee during the year. If the interested parties (contractor, contracting officer, and employees or their representative) cannot agree on the cash equivalent, the contracting officer shall submit the question for final determination to the Department of Labor as prescribed by agency procedures. The information submitted shall include --
(i) A comparison of the payments, contributions, or costs in the wage determination with those made or proposed as equivalents by the contractor; and
(ii) The comments and recommendations of the contracting officer.
(c) In computing required overtime payments, (i.e., 1 1/2 times the basic hourly rate of pay) the contractor shall use the basic hourly rate of pay in the wage determination, or the basic hourly rate actually paid by the contractor, if higher. The basic rate of pay includes employee contributions to fringe benefits, but excludes the contractor’s contributions, costs, or payment of cash equivalents for fringe benefits. Overtime shall not be computed on a rate lower than the basic hourly rate in the wage determination.
22.406-3 -- Additional Classifications.
(a) If any laborer or mechanic is to be employed in a classification that is not listed in the wage determination applicable to the contract, the contracting officer, pursuant to the clause at 52.222-6, Davis-Bacon Act, shall require that the contractor submit to the contracting officer, Standard Form (SF) 1444, Request for Authorization of Additional Classification and Rate, which, along with other pertinent data, contains the proposed additional classification and minimum wage rate including any fringe benefits payments.
(b) Upon receipt of SF 1444 from the contractor, the contracting officer shall review the request to determine whether it meets the following criteria:
(1) The classification is appropriate and the work to be performed by the classification is not performed by any classification contained in the applicable wage determination.
(2) The classification is utilized in the area by the construction industry.
(3) The proposed wage rate, including any fringe benefits, bears a reasonable relationship to the wage rates in the wage determination in the contract.
(c)
(1) If the criteria in paragraph (b) of this subsection are met and the contractor and the laborers or mechanics to be employed in the additional classification (if known) or their representatives agree to the proposed additional classification, and the contracting officer approves, the contracting officer shall submit a report (including a copy of SF 1444) of that action to the Administrator, Wage and Hour Division, for approval, modification, or disapproval of the additional classification and wage rate (including any amount designated for fringe benefits); or
(2) If the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed additional classification, or if the criteria are not met, the contracting officer shall submit a report (including a copy of SF 1444) giving the views of all interested parties and the contracting officer’s recommendation to the Administrator, Wage and Hour Division, for determination of appropriate classification and wage rate.
(d)
(1) Within 30 days of receipt of the report, the Administrator, Wage and Hour Division, will complete action and so advise the contracting officer, or will notify the contracting officer that additional time is necessary.
(2) Upon receipt of the Department of Labor’s action, the contracting officer shall forward a copy of the action to the contractor, directing that the classification and wage rate be posted in accordance with paragraph (a) of the clause at 52.222-6 and that workers in the affected classification receive no less than the minimum rate indicated from the first day on which work under the contract was performed in the classification.
(e) In each option to extend the term of the contract, if any laborer or mechanic is to be employed during the option in a classification that is not listed (or no longer listed) on the wage determination incorporated in that option, the contracting officer must require that the contractor submit a request for conformance using the procedures noted in paragraphs (a) through (d) of this section.
22.406-4 -- Apprentices and Trainees.
(a) The contracting officer shall review the contractor’s employment and payment records of apprentices and trainees made available pursuant to the clause at 52.222-8, Payrolls and Basic Records, to ensure that the contractor has complied with the clause at 52.222-9 Apprentices and Trainees.
(b) If a contractor has classified employees as apprentices, trainees, or helpers without complying with the requirements of the clause at 52.222-9 the contracting officer shall reject the classification and require the contractor to pay the affected employees at the rates applicable to the classification of the work actually performed.
22.406-5 -- Subcontracts.
In accordance with the requirements of the clause at 52.222-11 Subcontracts (Labor Standards), the contractor and subcontractors at any tier are required to submit a fully executed SF 1413, Statement and Acknowledgment, upon award of each subcontract.
22.406-6 -- Payrolls and Statements.
(a) Submission. In accordance with the clause at 52.222-8 Payrolls and Basic Records, the contractor must submit or cause to be submitted, within 7 calendar days after the regular payment date of the payroll week covered, for the contractor and each subcontractor,
(1) copies of weekly payrolls applicable to the contract, and
(2) weekly payroll statements of compliance. The contractor may use the Department of Labor Form WH-347, Payroll (For Contractor’s Optional Use), or a similar form that provides the same data and identical representation.
(b) Withholding for nonsubmission. If the contractor fails to submit copies of its or its subcontractors’ payrolls promptly, the contracting officer shall, from any payment due to the contractor, withhold approval of an amount that the contracting officer considers necessary to protect the interest of the Government and the employees of the contractor or any subcontractor.
(c) Examination.
(1) The contracting officer shall examine the payrolls and payroll statements to ensure compliance with the contract and any statutory or regulatory requirements. Particular attention should be given to --
(i) The correctness of classifications and rates;
(ii) Fringe benefits payments;
(iii) Hours worked;
(iv) Deductions; and
(v) Disproportionate employment ratios of laborers, apprentices or trainees to journeymen.
(2) Fringe benefits payments, contributions made, or costs incurred on other than a weekly basis shall be considered as a part of weekly payments to the extent they are creditable to the particular weekly period involved and are otherwise acceptable.
(d) Preservation. The contracting agency shall retain payrolls and statements of compliance for 3 years after completion of the contract and make them available when requested by the Department of Labor at any time during that period. Submitted payrolls shall not be returned to a contractor or subcontractor for any reason, but copies thereof may be furnished to the contractor or subcontractor who submitted them, or to a higher tier contractor or subcontractor.
(e) Disclosure of payroll records. Contractor payroll records in the Government’s possession must be carefully protected from any public disclosure which is not required by law, since payroll records may contain information in which the contractor’s employees have a privacy interest, as well as information in which the contractor may have a proprietary interest that the Government may be obliged to protect. Questions concerning release of this information may involve the Freedom of Information Act (FOIA).
22.406-7 -- Compliance Checking.
(a) General. The contracting officer shall make checks and investigations on all contracts covered by this subpart as may be necessary to ensure compliance with the labor standards requirements of the contract.
(b) Regular compliance checks. Regular compliance checking includes the following activities:
(1) Employee interviews to determine correctness of classifications, rates of pay, fringe benefits payments, and hours worked. (See Standard Form 1445.)
(2) On-site inspections to check type of work performed, number and classification of workers, and fulfillment of posting requirements.
(3) Payroll reviews to ensure that payrolls of prime contractors and subcontractors have been submitted on time and are complete and in compliance with contract requirements.
(4) Comparison of the information in this paragraph (b) with available data, including daily inspector’s report and daily logs of construction, to ensure consistency.
(c) Special compliance checks. Situations that may require special compliance checks include--
(1) Inconsistencies, errors, or omissions detected during regular compliance checks; or
(2) Receipt of a complaint alleging violations. If the complaint is not specific enough, the complainant shall be so advised and invited to submit additional information.
22.406-8 -- Investigations.
Conduct labor standards investigations when available information indicates such action is warranted. In addition, the Department of Labor may conduct an investigation on its own initiative or may request a contracting agency to do so.
(a) Contracting agency responsibilities. Conduct an investigation when a compliance check indicates that substantial or willful violations may have occurred or violations have not been corrected.
(1) The investigation must--
(i) Include all aspects of the contractor’s compliance with contract labor standards requirements;
(ii) Not be limited to specific areas raised in a complaint or uncovered during compliance checks; and
(iii) Use personnel familiar with labor laws and their application to contracts.
(2) Do not disclose contractor employees’ oral or written statements taken during an investigation or the employee’s identity to anyone other than an authorized Government official without that employee’s prior signed consent.
(3) Send a written request to the Administrator, Wage and Hour Division, to obtain--
(i) Investigation and enforcement instructions; or
(ii) Available pertinent Department of Labor files.
(4) Obtain permission from the Department of Labor before disclosing material obtained from Labor Department files, other than computations of back wages and liquidated damages and summaries of back wages due, to anyone other than Government contract administrators.
(b) Investigation report. The contracting officer must review the investigation report on receipt and make preliminary findings. The contracting officer normally must not base adverse findings solely on employee statements that the employee does not wish to have disclosed. However, if the investigation establishes a pattern of possible violations that are based on employees’ statements that are not authorized for disclosure, the pattern itself may support a finding of noncompliance.
(c) Contractor Notification. After completing the review, the contracting officer must--
(1) Provide the contractor any written preliminary findings and proposed corrective actions, and notice that the contractor has the right to request that the basis for the findings be made available and to submit written rebuttal information.
(2) Upon request, provide the contractor with rationale for the findings. However, under no circumstances will the contracting officer permit the contractor to examine the investigation report. Also, the contracting officer must not disclose the identity of any employee who filed a complaint or who was interviewed, without the prior consent of the employee.
(3)
(i) The contractor may rebut the findings in writing within 60 days after it receives a copy of the preliminary findings. The rebuttal becomes part of the official investigation record. If the contractor submits a rebuttal, evaluate the preliminary findings and notify the contractor of the final findings.
(ii) If the contracting officer does not receive a timely rebuttal, the contracting officer must consider the preliminary findings final.
(4) If appropriate, request the contractor to make restitution for underpaid wages and assess liquidated damages. If the request includes liquidated damages, the request must state that the contractor has 60 days to request relief from such assessment.
(d) Contracting officer’s report. After taking the actions prescribed in paragraphs (b) and (c) of this subsection--
(1) The contracting officer must prepare and forward a report of any violations including findings and supporting evidence to the agency head. Standard Form 1446, Labor Standards Investigation Summary Sheet, is the first page of the report; and
(2) The agency head must process the report as follows:
(i) The contracting officer must send a detailed enforcement report to the Administrator, Wage and Hour Division, within 60 days after completion of the investigation, if --
(A) A contractor or subcontractor underpaid by $1,000 or more;
(B) The contracting officer believes that the violations are aggravated or willful (or there is reason to believe that the contractor has disregarded its obligations to employees and subcontractors under the Davis-Bacon Act);
(C) The contractor or subcontractor has not made restitution; or
(D) Future compliance has not been assured.
(ii) If the Department of Labor expressly requested the investigation and none of the conditions in paragraph (d)(2)(i) of this subsection exist, submit a summary report to the Administrator, Wage and Hour Division. The report must include--
(A) A summarize of any violations;
(B) The amount of restitution paid;
(C) The number of workers who received restitution;
(D) The amount of liquidated damages assessed under the Contract Work Hours and Safety Standards Act;
(E) Corrective measures taken; and
(F) Any information that may be necessary to review any recommendations for an appropriate adjustment in liquidated damages.
(iii) If none of the conditions in paragraphs (d)(2)(i) or (ii) of this subsection are present, close the case and retain the report in the appropriate contract file.
(iv) If substantial evidence is found that violations are willful and in violation of a criminal statute, (generally 18 U.S.C. 874 or 1001) forward the report (supplemented if necessary) to the Attorney General of the United States for prosecution if the facts warrant. Notify the Administrator, Wage and Hour Division, when the report is forwarded for the Attorney General’s consideration.
(e) Department of Labor investigations. The Department of Labor will furnish the contracting officer an enforcement report detailing violations found and any corrective action taken by the contractor, in investigations that disclose--
(1) Underpayments totaling $1,000 or more;
(2) Aggravated or willful violations (or, when the contracting officer believes that the contractor has disregarded its obligations to employees and subcontractors under the Davis-Bacon Act), or
(3) Potential assessment of liquidated damages under the Contract Work Hours and Safety Standards Act.
(f) Other investigations. The Department of Labor will provide a letter summarizing the findings of the investigation to the contracting officer for all investigation that are not described in paragraph (e) of this subsection.
22.406-9 -- Withholding From or Suspension of Contract Payments.
(a) Withholding from contract payments. If the contracting officer believes a violation exists (see 22.406-8), or upon request of the Department of Labor, the contracting officer must withhold from payments due the contractor an amount equal to the estimated wage underpayment and estimated liquidated damages due the United States under the Contract Work Hours and Safety Standards Act. (See 22.302.)
(1) If the contracting officer believes a violation exists or upon request of the Department of Labor, the contracting officer must withhold funds from any current Federal contract or Federally assisted contract with the same prime contractor that is subject to either Davis-Bacon Act or Contract Work Hours and Safety Standards Act requirements.
(2) If a subsequent investigation confirms violations, the contracting officer must adjust the withholding as necessary. However, if the Department of Labor requested the withholding, the contracting officer must not reduce or release the withholding without written approval of the Department of Labor.
(3) Use withheld funds as provided in paragraph